Setting Client Expectations and Avoiding Money-Losing CI Mistakes

Mar 10

Written by: Todd Anthony Puma
3/10/2014 11:48 PM  RssIcon

I was just watching Shark Tank on ABC the other night. While most reality TV is not for me, I like to see how people pitch their businesses to the Sharks. Robert Herjavec made a comment that rang true to me. He said, “Insanity is doing the same thing over and over, but expecting different results.” It’s a common saying, but it made me reflect on the fact that one of my main goals back when I started the Home Theater Rebuild was to help people getting into the industry by sharing the mistakes I made in the past, so that they could avoid them and ramp up faster, more profitably.

I would like to think that I was successful, as I have been told by several integrators that my advice really helped. But, no one is perfect, and I continue to make mistakes and several of my colleagues do, as well. The key is learning from them. I thought I would take an opportunity to share a few of the nuggets I’ve learned over time.

1. Down-Spec to a Degree, with Caveats
It happens to us all. A client likes us, likes our work, but doesn’t want to spend (or can’t afford) our estimate. While we never reduce our prices—that just takes profit out of our business, industry, and family—we do “down-spec.” A few recent instances, however, have reminded me that caution needs to be exercised when taking this approach. Recently, one of my colleague’s clients didn’t want to do a full audio system for his living room, so he down-spec’d to a powered soundbar. The client couldn’t afford the Paradigm Soundtrack that my colleague recommended, so he went with a $400 soundbar from another brand. Unfortunately, that is where all the trouble began.

The first soundbar cut out and “popped” on occasion. After replacing the optical audio cable and trying all possible settings, it was determined that the product was defective. The manufacturer was supportive and accepted an exchange (but wouldn’t send an advance replacement, so client was without a soundbar for weeks). Then, because the soundbar was poorly designed, the optical audio ports are on the bottom and point straight down. While making a clean install, the installer bent the optical too much; it was not enough to totally damage it or to notice it right away, but it was enough to make the sound intermittent over time. It took several visits to figure out the problem and replace the optical audio cable. This one soundbar, to save the client $400 over the Paradigm, required four to five visits to the client’s home. Three of those were due to the poor design of the bar. The moral here is to be careful how far down the range of product category you are willing to go, and to know the product you are recommending inside and out. This integrator will now no longer sell this brand.

2. Don’t Let Clients Shift the Cost to You
I also heard another story recently where a customer balked at the price tag for a universal remote (including RF base station and programming) and insisted they were comfortable using multiple remotes to control channel, volume, source, etc. So the company specified and installed an IR repeater kit. Well, the client wasn’t as savvy as they thought they were and the company has spent four to five hours training the client on usage over two visits. The client saved a lot of money by not spending on a remote, but now the company has incurred significant man-hour costs in training. You can be sure that from now on, they will estimate additional training hours (and put an explicit cap on training hours included with the install) if a client opts to save money by not using a universal remote.

3. Set Expectations When Trying Solutions That are Not Guaranteed (or Don’t Offer Them at All)
Similar to the universal remote example above, a client recently called to have a TV mounted over a fireplace. Easy job. It would be even easier because power was already there and when they remodeled years ago, the contractor put in a component video cable. We went in, mounted the TV, and guess what? One of the five component video cables didn’t work…must have been damaged way back when it was installed.
 
We told the client his options:
a. Run new wiring (HDMI and Cat-6), but that means having to open up the wall
b. We can do an HDMI over 5-coax converter (the 5th wire is for IR, so we wouldn’t have IR repeater ability, but not critical), but converters are notoriously fickle
c. Wireless HDMI—only a last ditch effort

So the client chose to go with the 5 coax converter. It worked for a little while, then began to lose sound. The client still didn’t want to open the wall, so asked to try wireless HDMI. No luck. We finally had to open the walls and run HDMI cables. But because the client made comments and hemmed and hawed about how much it was costing them for a simple TV mounting and because I felt bad, I didn’t charge them enough for the labor. We ended up losing a little bit on this. If we had fully billed, it would have cost the client over $1,000 for a TV mounting. Had we set expectations early on (i.e. “We can try the 5-coax adapter, then the wireless HDMI, and if all else fails we can run new wires, but each visit is going to cost your $200 to set up the new device and running wires will cost more than that”) maybe the client would have been convinced to run the wire to begin with.

These all seem so straightforward and simple, but they are the types of mistakes that are easy to make in the moment, whether trying to win a job, provide a great client experience, or not seem like a charlatan. I am sure there are dozens if not hundreds of other examples, but it what it really all comes down to is setting expectations with clients up front and valuing your time as much as they value theirs.
 
 
 
 
+Todd Anthony Puma is president of The Source Home Theater Installation in New York City.

 

5 comment(s) so far...


Gravatar

Re: Setting Client Expectations and Avoiding Money-Losing CI Mistakes

I agree that at times the integrator feels and is, compelled to leave a happy client and that exceeds the quote due to things not going as planned. I have had some projects like this and they usually occur when adding to an existing project not originally done by your own company. You go in with expectations of a smooth install, then something raises an ugly head. I have come to the conclusion that letting the client know "in the beginning", from the start what you expect and going over what they expect and the costs associated. I try to spell it out very clearly and hope they can understand a bump in the road.

By Bob Lieto on   3/12/2014 4:53 PM
Gravatar

Re: Setting Client Expectations and Avoiding Money-Losing CI Mistakes

We have found using a comprehensive and standardized Scope Statement Template helps us spell out expectations for our equipment and any disclaimers for client provided services or equipment. Putting things in writing is always preferable when handling a potential dispute.

By Michael pope on   3/12/2014 11:52 PM
Gravatar

Re: Setting Client Expectations and Avoiding Money-Losing CI Mistakes

Todd, in my market I don't think there is an animal called a smooth install? Destination resort and retirement, everyone is moving their 8 year old flat panels and audio systems and want to re-install. Then dealing with 10 - 12 year old pre-wires featuring zip cord for speaker wire, 3 runs of coax for audio and composite video to TV's above fireplace.
And, as you mentioned, the remote control issue, training the client. On a forum, a colleague recommends if the client is not willing to pay for a universal remote or training, leave the manuals in the restroom
Dan C

By audioplus93 on   3/14/2014 1:43 PM
Gravatar

Re: Setting Client Expectations and Avoiding Money-Losing CI Mistakes

When faced with a similar residential situation we always opt for the Peerless HDS200 HD Flow wireless HDMI system. The cost and sell price are set, add your custom install labor and everyone wins.

By Larry Rosenberger on   3/17/2014 3:57 PM
Gravatar

Re: Setting Client Expectations and Avoiding Money-Losing CI Mistakes

I agree, your point number one is a tough lesson to learn. Getting your butt kicked with customer provided gear is probably the only way.

The stance I have taken is "go with my product, and I take the hit if there's an issue". If I install a customer's product, on most smaller jobs, then it's all T&M. That's usually fair to both parties.

I had this happen with my tax guy just last month. After I dropped of my paperwork for the year it turned into a site survey / consultation, which was fine. When he got my quote though it was "I wanted to spend half that". And I by no means did I shoot for the stars. I told him he could buy cheaper gear on his own and I would set it up for him, but I didn't want to be fully attached for entry level gear.

I would rather offer higher end, higher quality solutions that I know I can deliver on, and stand behind over time.

By Tom Kofski on   3/17/2014 5:42 PM

Your name:
Gravatar Preview
Your email:
(Optional) Email used only to show Gravatar.
Your website:
Title:
Comment:
Security Code
CAPTCHA image
Enter the code shown above in the box below
Add Comment   Cancel 

 

Archive
<May 2015>
SunMonTueWedThuFriSat
262728293012
3456789
10111213141516
17181920212223
24252627282930
31123456
Monthly
May 2015 (9)
April 2015 (15)
March 2015 (14)
February 2015 (11)
January 2015 (16)
December 2014 (12)
November 2014 (10)
October 2014 (19)
September 2014 (21)
August 2014 (13)
July 2014 (15)
June 2014 (12)
May 2014 (12)
April 2014 (14)
March 2014 (15)
February 2014 (14)
January 2014 (24)
December 2013 (11)
November 2013 (12)
October 2013 (15)
September 2013 (19)
August 2013 (18)
July 2013 (19)
June 2013 (12)
May 2013 (18)
April 2013 (17)
March 2013 (13)
February 2013 (16)
January 2013 (26)
December 2012 (9)
November 2012 (11)
October 2012 (16)
September 2012 (11)
August 2012 (15)
July 2012 (13)
June 2012 (8)
May 2012 (9)
April 2012 (10)
March 2012 (7)
February 2012 (11)
January 2012 (14)
December 2011 (5)
November 2011 (12)
October 2011 (8)
September 2011 (4)
August 2011 (7)
July 2011 (11)
June 2011 (12)
May 2011 (8)
April 2011 (6)
March 2011 (9)
February 2011 (10)
January 2011 (9)
December 2010 (4)
November 2010 (7)
October 2010 (4)
September 2010 (9)
August 2010 (7)
July 2010 (8)
June 2010 (12)
May 2010 (6)
April 2010 (8)
March 2010 (10)
February 2010 (11)
January 2010 (1)
December 2009 (6)
November 2009 (6)
October 2009 (11)
September 2009 (6)
August 2009 (4)
July 2009 (4)
June 2009 (5)
May 2009 (7)
April 2009 (9)
March 2009 (7)
February 2009 (9)
January 2009 (8)
December 2008 (9)
November 2008 (6)
October 2008 (7)
September 2008 (7)
August 2008 (3)
July 2008 (5)
May 2008 (1)
April 2008 (4)
March 2008 (3)
February 2008 (5)
January 2008 (2)
November 2007 (1)
October 2007 (4)
September 2007 (2)
August 2007 (3)
July 2007 (4)
June 2007 (6)
May 2007 (6)
April 2007 (4)
March 2007 (4)

 

Skip Navigation Links.
Skip Navigation Links.
download

Get Your Copy of Dolby's Latest Atmos Demo Disc
Read More»
By John Sciacca

You Need to Be Human in This Digital World
Read More»
By Heather L. Sidorowicz

With New Technology, Best is Always Better Than First
Read More»
By Todd Anthony Puma

Work It! A Running Playlist to Get You Through Your Day
Read More»
By John Sciacca

Cutting the Baby in Half: Mediating Customer Complaints
Read More»
By John Sciacca

Slide Show
Slide Show

Audio Video Systems, Plainview, NY
Slide Show

Station Earth, Fergus, Ontario, Canada
Slide Show

Audio Command Systems, Westbury, NY
Slide Show

Evolution Video and Sound, Calgary, Alberta, Canada
Stop Obesity - Buy Every Child A Wifit Game
Read More»
Magic 99 Guides For Runescape Gamers
Read More»
RS Player Post Finding the Twillow Tree
Read More»
Warlords of Draenor - Can Your pc Run It?
Read More»
FIFA World Football Museum opens showroom
Read More»
World Of Warcraft Create Player And Logging In
Read More»
Most Famous Bike Racing Game - Superbike 2001 For Pc
Read More»
Top 5 Video Games That Can Be Better Than Than Their Reality
Read More»
Runescape Guide - Miscellaneous Guides - Faruq's Tools
Read More»
a chance to advance into the World Cups kno
Read More»